Office Refurbishment, Birmingham    
        Works carried out:    
We stripped out the outdated fixtures and fittings, installed new floor to ceiling glazed partitions to separate the office space, fitted a new suspended ceiling and new flooring. In addition, new lighting was installed, along with new power and data points, and we redecorated the new office space.